Close Close Menu

Talk to us about this service

Call Me

The Hazard Identification (HAZID) methodology can be summarised by the following sequential steps: General description of site/location and outline operations; […]

The Hazard Identification (HAZID) methodology can be summarised by the following sequential steps:

  • General description of site/location and outline operations;
  • Complete an overview of process, including design intent, design parameters and expected operating parameters;
  • Apply a guideword to act as a prompt for ‘brainstorming’;
  • Identify the potential causes of hazardous events relevant to that guideword;
  • For each event, identify the ultimate consequences associated with the events, irrespective of safeguards;
  • For each consequence, identify the potential safeguards;
  • Decide on any recommendations/ actions to eliminate or mitigate the identified hazards, if necessary;
  • Repeat until all events/ consequences have been analysed, and
  • Repeat for other guidewords as relevant;

Process Hazard Analysis - Related Services

To find out more about how Arthian can work with you, please get in touch.

Get in touch with us about this Service

Documents
  • Drop files here or
    Max. file size: 100 MB.
    Please attach any files related to your enquiry.
  • This field is for validation purposes and should be left unchanged.